Projects

We have successfully completed numerous contracts for both infrastructure projects and private developments across East Africa. Click on the links below to find out more about some of our projects.

Marriot Hotel: Contiguous Piled Wall and Ground Anchors, Ongoing

Marriot Hotel: Contiguous Piled Wall and Ground Anchors, Ongoing

Tilenga Conductor Pipes: Drilling Services, Welding, Testing, Ongoing

Tilenga Conductor Pipes: Drilling Services, Welding, Testing, Ongoing

Saka Bridge: Rotary Piling and Load Testing, March 2023

Saka Bridge: Rotary Piling and Load Testing, March 2023

Mutundwe-Entebbe Transmission Line: Rotary Piles, Civils Construction, February 2023

Mutundwe-Entebbe Transmission Line: Rotary Piles, Civils Construction, February 2023

Gabiro Agribusiness Hub - Secant Piles Water Intake, January 2023

Gabiro Agribusiness Hub - Secant Piles Water Intake, January 2023

Kingfisher Oil Field Conductor Pipes - Drilling Services, November 2022

Kingfisher Oil Field Conductor Pipes - Drilling Services, November 2022

UFZA Southern Embankment Slope Stabilisation - Soil Nailing, November 2022

UFZA Southern Embankment Slope Stabilisation - Soil Nailing, November 2022

Lukaya Landing Site: CFA Piles, August 2022

Lukaya Landing Site: CFA Piles, August 2022

Kiira Motors Factory: CFA Piling and Integrity Testing, June 2022

Kiira Motors Factory: CFA Piling and Integrity Testing, June 2022

Kakiri Bridge: CFA Bearing Piles and Static Load Testing, March 2022

Kakiri Bridge: CFA Bearing Piles and Static Load Testing, March 2022

Kibimba Bridge: CFA Piling, Integrity Tests, Static Load Testing, February 2022

Kibimba Bridge: CFA Piling, Integrity Tests, Static Load Testing, February 2022

Ntoroko Lakeport: Sheet Pile Wharf and Rotary Piled Jetty, January 2022

Ntoroko Lakeport: Sheet Pile Wharf and Rotary Piled Jetty, January 2022

Tororo Solar Farm: Driven Piles, September 2021

Tororo Solar Farm: Driven Piles, September 2021

Ggaba Water Treatment Works: Injection Grouting, September 2021

Ggaba Water Treatment Works: Injection Grouting, September 2021

Aquadaf at Ggaba Water Intake: Rotary Piling, February 2021

Aquadaf at Ggaba Water Intake: Rotary Piling, February 2021

Kampala Flyover: Sheet Piling, February 2021

Kampala Flyover: Sheet Piling, February 2021

Kampala Flyover: Pile Load Testing, January 2021

Kampala Flyover: Pile Load Testing, January 2021

Saddler Way: Design and Build, CFA Piling, January 2021

Saddler Way: Design and Build, CFA Piling, January 2021

Arua Solar Foundations: Load Testing, November 2020

Arua Solar Foundations: Load Testing, November 2020

Mukono Pipeline: CFA, August 2020

Mukono Pipeline: CFA, August 2020

Olkaria Geothermal Power Station: Sheet Piling, March 2020

Olkaria Geothermal Power Station: Sheet Piling, March 2020

Katosi Water Treatment Works: Secant Wall, December 2019

Katosi Water Treatment Works: Secant Wall, December 2019

Karuma-Lira Transmission Line: Pile Load Testing, October 2019

Karuma-Lira Transmission Line: Pile Load Testing, October 2019

Kampala Basement: CFA Retaining Wall and Soil Anchors, September 2019

Kampala Basement: CFA Retaining Wall and Soil Anchors, September 2019

Karuma-Lira Transmission Line: Pile Foundation Installation, August 2019

Karuma-Lira Transmission Line: Pile Foundation Installation, August 2019

Ora Bridge: CFA, August 2019

Ora Bridge: CFA, August 2019

Ormat Tank: Civil Construction, August 2019

Ormat Tank: Civil Construction, August 2019

PPDA Building: Contiguous Pile Wall, December 2018

PPDA Building: Contiguous Pile Wall, December 2018

Kenya Coast Slipway: Marine Construction, August 2018

Kenya Coast Slipway: Marine Construction, August 2018

Twed Heights: Rotary Piles, June 2018

Twed Heights: Rotary Piles, June 2018

Kampala Northern Bypass Footbridges: CFA and Pile Testing, February 2017

Kampala Northern Bypass Footbridges: CFA and Pile Testing, February 2017

Bidco Tank: CFA, December 2016

Bidco Tank: CFA, December 2016

Nakivubo WWTP: Sheet Piling, September 2016

Nakivubo WWTP: Sheet Piling, September 2016

Nakivubo WWTP: CFA and Pile Testing, February 2016

Nakivubo WWTP: CFA and Pile Testing, February 2016

Ndaiga Bridge, CFA and Pile Testing, August 2015

Ndaiga Bridge, CFA and Pile Testing, August 2015

Namataba Cement Works: CFA and Pile Testing, February 2015

Namataba Cement Works: CFA and Pile Testing, February 2015

Soroti Intake Works: CFA, November 2014

Soroti Intake Works: CFA, November 2014

The premier piling contractor in East Africa